Use eRedbook,cementingtables, log viewers, and more to assist with daily operations.
[email protected]Use eRedbook,cementingtables, log viewers, and more to assist with daily operations.
[email protected]With advanced technology, excellent quality and considerate service, it has achieved nationwide coverage and exported to foreign countries.
Our Hot Products - Have been exported to more than 150 countries and well recognized as money-maker for mining and mineral industries.
x = 15.11b of hematite per sk ofcementused.Calculationsfor the Number of Sacks ofCementRequired. If the number of feet to be cemented is known, use the following: Step 1. Determine the following capacities: a) Annular capacity, ft3/ft: y J 183.35. b) Casing capacity, ft3/ft: c) Casing capacity, bbl/ft: Casing capacity, bbl/ft =-Step 2
moreHalliburton’s eRedBook® Mobile application is offered as a free download. It is derived from theHalliburton CementingTables, the industry-preferred data reference forcalculationsused in drilling,cementingand/or completing oil and gas wells. eRedBook® Mobile contains volume calculators as well as data from the American Petroleum Institute (API) for Casing, Tubing, Coil Tubing and ...
moreAnestimationof the volume ofcementneeded for removal of mud cake by turbulent flow is : Volume of fluid (in turbulent flow), ft 3 /bbl= 5.616 x contact times, minutes x displacement rate, bbl/min
moreFor more than 75 years, the RedBook®cementingtables have been a part ofHalliburton's legacy and the industry preferred printed technical reference. Today,Halliburtonis setting a new industry standard for digital technical tools with the evolution of the eRedBook digital oilfield toolkit, an electronic version that goes beyond what has ...
moreLearns how to develop thecementdesign that meet customer requirements andHalliburton's commercial expectations followingHalliburtonManagement System procedures and usingHalliburtonsimulation software. Learns to determine lab testing requirements and testing conditions, job preparation, and interpreting well site data for post job analysis.
moreIt is essential to these operations that a competentcementplug is placed the first time. Properly placing the designedcementplug helps reduce nonproductive rig time, minimize wasted material, and mitigate the need for additionalcementingservices. Plugging oil or gas wells is a very common operation.
moreSqueezecementingoperations may be performed at any time during the life of the well: drilling, completions or producing phases. Invariably, though, it is an operation undertaken to remedy a problem and presents the challenge of placing the proper amount ofcement(or sealant) in the target location.
moreJan 20, 2017· Filed Under: General, PrimaryCementingTagged With:cement calculations,cementvolumecalculation, primarycementingArticle Posted By: Lenin Diaz is an oil industry specialist with 24 years of technical and operational expertise in fluids,cementing, water control and shut-off.
moreIf using the OverDrive system must be laid down and 500T elevators installed prior to making up BJ/Halliburton cementhead. This will allow casing to be landed whilst maintaining pressure if floats fail. Make upcementhead crossover andcementhead. Ensure bottom and top plugs are loaded in thecementhead correctly.
moreCementing Calculations• Solution: – Yield ofcement= 1.18 cu.ft/sk (Halliburton) –Cementvolume • Annular Capacity = .1745 cu ft/ft (Halliburton) • Annular Vol = .1754 cuft/ft X 2000’ = 349 cu ft • Casing Capacity = .2210 cu ft/ft • Casing Volume = .2210 X 80 = 17.68 cu. ft. •Cementvolume = 349 + 17.68 cu. Ft = 366.68 cu. ft.
moreNote: Since your browser does not support JavaScript, you must press the button below once to proceed. Sign In -Halliburton
moreApr 19, 2019· Volumetriccalculationsto place a balancedcementplug can be easily done based on the well schematic, pipe’s dimensions, open hole and casing sizes and the finalcementplug length. See next images for an examplecalculation. It is common practice to slightly under-displace the …
more